Standard Construction Specifications Part 2: Abu Dhabi – General Construction & Site Works
- Class K9 minimum
- Polyethylene sleeving for corrosion protection
- Hydrostatic test pressure: 1.5× working pressure (minimum 10 bar above)
- Site Preparation and Clearance: The specifications require that the site be cleared of all debris, vegetation, and obstructions before construction begins. The site shall be leveled and graded to ensure that it is free from any depressions or uneven areas.
- Excavation and Backfilling: The specifications provide detailed requirements for excavation and backfilling, including the use of shoring and bracing to prevent soil collapse.
- Concrete Works: The specifications cover the requirements for concrete materials, mixing, placing, and curing. The specifications also provide requirements for the testing of concrete cubes and cylinders.
- Masonry Works: The specifications provide requirements for the construction of masonry walls, including the use of mortar, laying of masonry units, and pointing.
- Structural Steel Works: The specifications cover the requirements for the fabrication and erection of structural steel, including welding, bolting, and painting.
- Finishing Works: The specifications provide requirements for finishing works, including plastering, painting, and flooring.
SCS Part 2
Before submitting a work method statement (WMS) to the Resident Engineer, verify these 10 items against :