Bs En 12390-2:2019 Page
The Foundation of Reliable Concrete Testing: An Analysis of BS EN 12390-2:2019
Scope and Purpose
Where to obtain the standard
- Cover the specimen immediately with a non-absorbent, airtight cover (e.g., plastic sheet or damp hessian if covered by plastic) to prevent moisture loss.
- Store the moulded specimen in an environment at 20°C ± 5°C for the first 24 hours (for standard curing). Avoid drafts, direct sunlight, or vibration.
: Concrete is placed into moulds in layers and compacted using methods such as a vibrating table










